What Should a Stone Quotation Say About Payment and Design Changes?

Commercial disputes often begin when a price is treated as complete while geometry, quantities, finish, inspection or delivery responsibility remain open. A clean quotation makes those assumptions visible before money or production is committed.

In brief

What Should a Stone Quotation Say About Payment and Design Changes?

The quotation should identify the exact scope and revision, inclusions, exclusions, Incoterm, validity period, taxes or duties, sample and testing assumptions, payment milestones and the written variation process. No payment or change term should be inferred from a general web page; the signed quotation and contract control the project.

This guide is general manufacturing and coordination information. Contract documents, engineering and destination requirements control each actual project.

Technical illustration of a stone quotation scope, approval gates, drawing revision, updated component schedule and production release
Workflow illustrationIllustration of the workflow — not a completed client project.

Workflow illustration

See the decision before reading the detail.

Process illustration: tie quotation scope, approvals, commercial milestones and drawing changes to a controlled revision before changed work enters production.

Boda Stone factory photographs follow below.

Procurement parameters

Define the input, control and deliverable.

Use this table in an RFQ, technical submittal or inspection plan. Values remain project-specific; the table shows what must be made explicit.

ParameterBuyer should stateFactory-controlled output
Scope basisLatest drawing register, quantities, stone, finish and destinationWritten assumptions, inclusions, exclusions and revision basis
Approval gatesDecision owners and required samples or first articlesDated approval register and production-release status
InspectionAcceptance criteria, witness points and reporting needsPiece-linked inspection and nonconformance records
DeliveryIncoterm, destination access and required delivery sequencePiece list, crate list, weights and loading reference
01

Fix the pricing basis

Reference the dated drawing list, bill of quantities, stone, finish, packaging, destination, currency and Incoterm. State what is provisional and what information triggers re-pricing.

02

Connect payment to verifiable milestones

The contract should define invoice timing, evidence required for each milestone, bank details, currency charges and the procedure for disputed amounts. Boda Stone's actual terms must be taken from the issued quotation or contract.

03

Use written variation control

Before changed work proceeds, record the request, affected drawings and pieces, price change, schedule change, obsolete work and approval authority. Emergency instructions should be confirmed in writing.

Related questions

Short answers for project teams.

The fastest project-specific answer starts with the current drawing, dimension, material and destination.

How long is a stone quotation valid?+

The validity period must be stated on the issued quotation because stone availability, freight, exchange rates and project scope can change.

What are Boda Stone's standard payment terms?+

Use only the terms written in the project quotation and contract. This guide does not publish or replace company-specific commercial terms.

What happens if drawings change after production starts?+

The affected pieces, material already committed, rework, price and programme impact should be reviewed and approved as a written variation before proceeding.

Apply the guide

Review the actual project information.

Send the drawings or model, known dimensions, quantity, proposed stone, destination and current open questions.