Minimum information for an initial review
The first review should identify the building area, component families, approximate dimensions and commercial destination.
- Current PDF drawing set
- Component or elevation mark-ups
- Approximate quantities
- Proposed stone and finish
- Destination country and delivery window
Information needed before production
Production should rely on approved geometry and interfaces rather than presentation drawings alone.
- Dimensioned profiles and sections
- Joint locations and component divisions
- Anchor or fixing interfaces from the responsible designer
- Approved samples and visual range
- Piece marks and drawing revision status
How to handle incomplete drawings
List open decisions in the enquiry. A responsive quotation can state assumptions, exclusions and the information required for final confirmation instead of pretending the design is complete.



